LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 1998 >> T100 Base, Automatic >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Component Tests >> Seat Belt Warning System >> Integration Relay Operation (T100)

Integration Relay Operation (T100)

  1. Turn ignition switch to OFF position. Remove integration relay from junction block No. 1, behind left kick panel. Using a jumper wire, connect positive battery terminal to integration relay terminals No. 3 and 9. See Fig 1. Connect a 12-volt, 3.4-watt test light between integration relay terminals No. 8 and 9.
  2. Using a jumper wire, connect negative battery terminal to integration relay terminal No. 7. Test light should be on and relay buzzer should sound for 4-8 seconds.
  3. Repeat previous steps and operate relay buzzer again. With buzzer on, connect another jumper wire between negative battery terminal and integration relay terminal No. 6. Buzzer noise should stop. If operation is not as specified, replace integration relay.
Fig 1: Testing Integration Relay (T100)
G98G10823Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002