LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 1992 >> Tercel LE, Standard >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Instrument Panel - Standard >> Testing >> Fuel Sending Unit Tests >> Fuel Sending Unit Resistance Test

Fuel Sending Unit Resistance Test

  1. Turn ignition off. Remove fuel sending unit from tank. Connect ohmmeter to appropriate sending unit terminals. See FUEL SENDING UNIT CONNECTOR TERMINALS  table. Sending unit connector terminals are located opposite harness connector terminals. See Figure through Figure .
  2. Move sender arm and ensure resistance is within specifications. See FUEL SENDING UNIT RESISTANCE SPECIFICATIONS  table. After a short delay, gauge pointer should move when sender is connected and float arm is moved.
FUEL SENDING UNIT CONNECTOR TERMINALS

Model Sending Unit Connector Terminals
Camry, Cressida & 4Runner 1 & 2
Celica, Corolla & Supra 3 & 4
Land Cruiser 4 & 5
MR2 & Pickup 1 & 3
Paseo 1 & 4
Previa 2 & 3
Tercel (1)
(1) When measuring sending unit resistance, connect ohmmeter between Red and Black wires of sending unit connector.
FUEL SENDING UNIT RESISTANCE SPECIFICATIONS

Float Position Ohms
Full
MR2, Paseo & Tercel 2-4
Supra 3-5
All Others 3
Half
4Runner 32-33
Empty
MR2, Paseo & Tercel 102-118
Supra 102-118
All Others 110