LEMON Manuals: Even more car manuals for everyone
Home >> Suzuki >> 2001 >> XL-7 Limited >> Repair and Diagnosis >> External Pages >> Different car >> Section 94 (Overhaul - A/T) >> Repair Instructions >> Oil Cooler Pipes Removal and Installation >> Installation

Oil Cooler Pipes Removal and Installation: Installation

WARNING: This page is about a different car, the 2004 Suzuki XL-7. However, it is still accessible from the selected car via links, so may be relevant.
  1. Use new union gaskets and connect oil cooler pipes to oil outlet unions.
  2. Connect hoses to pipes and clamp them securely.
  3. Tighten union bolts (2) to specified torque with oil outlet union locked.

    Tightening torque 

    1. Oil cooler pipe union bolt (a): 25 N.m (2.5 kg-m, 18.0 lb-ft)
  4. Tighten pipe clamp bolt (3) with specified torque.

    Tightening torque 

    1. Pipe clamp bolt (b): 10 N.m (1.0 kg-m, 7.5 lb-ft)
    Fig 1: Tightening Pipe Clamp Bolt
    G00761573Courtesy of SUZUKI OF AMERICA CORP.
  5. Check A/T fluid level according to procedure described in A/T Fluid Change  .
  6. Check for fluid leakage after warming up A/T.