Meter Pointer Operation Check
In meter pointer operation check, the meter operation, warning/indicator light, illumination and LCD/TFT are checked.
- After a buzzer sounds for 0.5 seconds and "STEP1" is displayed on LCD/TFT, the meter pointer operation check mode is initiated.
| Time (sec) | Meter indicator | LCD/TFT display, illumination | Warning light/indicator light | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 6 | MIN indication ↓ MAX indication |
ILL1 (Min. brightness) ↓(4) ILL6 (Max. brightness) |
(1), (2), (3) | ||||||||
| 6 | MAX indication ↓ MIN indication |
ILL6 (Max. brightness) ↓ (4) ILL1 (Min. brightness) |
|||||||||
|
|||||||||||