Unit Inspection
WARNING: This page is about a different variant/trim than selected.
- Check that the purge control solenoid valve has no deformation, cracks or other damages.
- Measure the resistance between the purge control solenoid valve terminals.
Terminal No. Standard 1 and 2 24.5 ± 1.5 Ω (when 20°C (68°F)) - Check that air does not come out from (B) when air is blown into (A).
- Connect the battery positive terminal to the terminal No. 1 and the battery negative terminal to the terminal No. 2. Check that air is discharged from (B), when supplying air to (A).