LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2020 >> Ascent Touring >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Engine Intake System (Induction) And Turbocharger >> Intake Duct >> Installation >> Intake Duct No. 2

Intake Duct No. 2

  1. Replace the intake duct No. 2 gasket with a new part.
    G13198591Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the intake duct No. 2 and lock it.
    CAUTION:
    • Make sure there are no damage or dust on connections. If necessary, clean the seal surface of the pipe.
    • Confirm that the connections are secure.

    Tightening torque: 

    16 N.m (1.6 kgf-m, 11.8 ft-lb)

    NOTE: It is possible to install with the spring locked.
  3. Install the bolt.

    Tightening torque:  16 N.m (1.6kgf-m, 11.8ft-lb)

    G00595296Courtesy of SUBARU OF AMERICA, INC.
  4. Install the under cover front, Ref. to EXTERIOR/INTERIOR TRIM>FRONT UNDER COVER>INSTALLATION .
  5. Install the intercooler. Ref. to INTAKE (INDUCTION) (H4DOTC)>INTERCOOLER>INSTALLATION .
  6. Install the air intake duct. Ref. to INTAKE (INDUCTION) (H4DOTC)>AIR INTAKE DUCT>INSTALLATION .