Exhaust Manifold (FA20): Installation
- Exhaust manifold installation
- Install two new gaskets.
- Install the exhaust manifold with the six nuts.
Standard value: T=30N.m {306kgf.cm} {22.1ft.lbf}
- Install a new gasket to the exhaust pipe SUB-ASSY FR installation portion of exhaust manifold.
- Install the exhaust pipe SUB-ASSY FR with the two nuts.
Standard value: T=42.5N.m {433kgf.cm} {31.3ft.lbf}
- Installation of exhaust pipe ASSY FR (Refer to INSTALLATION )
- Install the connector for oxygen sensor connector and the two clamps. (Refer to INSTALLATION )
- Install the connector for air/fuel ratio sensor and the 2 clamps. (Refer to INSTALLATION )
- Connection of the battery ground terminal
Standard value: T=6.0N.m {61kgf.cm} {4.4ft.lbf}
- Exhaust gas leakage check
- Make sure that there is no exhaust gas leakage from the connections of exhaust pipes and the mounting portion of each sensor.