Combination Meter ASSY: Installation
NOTE:
The procedures described below are for the normal meter. Operate the TFT meter performing the same procedures as the normal meter.
- Installation of the combination meter ASSY
- Connect the connector.
- Engage two clips and install the combination meter ASSY.
- Install the 2 screws.
- Installation of the instrument panel meter ornament UPR (Refer to INSTALLATION )
- Installation of the meter hood SUB-ASSY (Refer to INSTALLATION )
- Installation of instrument cluster finish panel SUB-ASSY CTR (Refer to INSTALLATION )
- Installation of the instrument panel ornament (Refer to INSTALLATION )
- Connection of the battery ground terminal
Standard value: T=6.0Nm {61kgfcm} {4.4ftlbf}
- Settings when removing/installing battery terminals (Refer to SETTING PROCEDURES AT PARTS REPLACEMENT AND REMOVAL/INSTALLATION )