Intake Duct No. 1
- Install the intake duct No. 1 using new O-rings and gaskets.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Connect the vacuum hose and the water hose.
- Connect the PCV pipe assembly to the intake duct No. 1.CAUTION:
- Make sure there are no damage or dust on connections. If necessary, clean the seal surface of the pipe.
- Confirm that the connections are secure.
NOTE: It is possible to install with the spring locked. - Connect the intake duct No. 1 and the air intake boot.
Tightening torque:
2.5 N.m (0.3 kgf-m, 1.8 ft-lb)
- Install the under cover front, Ref. to EXTERIOR/INTERIOR TRIM>FRONT UNDER COVER>INSTALLATION .
- Install the air intake duct, Ref. to INTAKE (INDUCTION) (H4DOTC)>AIR INTAKE DUCT>INSTALLATION .
- Connect the battery ground terminal. Ref. to REPAIR CONTENTS>NOTE>BATTERY .
- Fill engine coolant. Ref. to COOLING (H4DOTC)>ENGINE COOLANT>REPLACEMENT>FILLING OF ENGINE COOLANT .