LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2017 >> Forester 2.0XT Touring >> Repair and Diagnosis >> Transmission >> Automatic Trans >> CVT Transaxle (Tr690) >> Preparation for Overhaul >> Procedure

Preparation for Overhaul: Procedure

  1. Clean the transmission exterior.
  2. Remove the torque converter assembly. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION (TR690)>Torque Converter Assembly>REMOVAL .
  3. Attach the ST on the transmission.

    ST 18632AA000 STAND ASSY 

    Fig 1: Installing ST Onto Transmission
    G09482060Courtesy of SUBARU OF AMERICA, INC.
  4. Remove the transmission cover on the transmission upper side.
    NOTE: Install using the following tightening torque.

    Tightening torque: 

    8 N.m (0.8 kgf-m, 5.9 ft-lb)

    Fig 2: Identifying Transmission Upper Side Cover
    G10406880Courtesy of SUBARU OF AMERICA, INC.
  5. Place the transmission assembly on end.