Intake Duct No. 1
- Install the intake duct No. 1 to the turbocharger.NOTE:
- Use new O-rings.
- Be careful not to pinch the O-ring.
- Check that the air by-pass valve is firmly inserted into the intake duct No. 1.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Install the air intake boot (A) to the intake duct No. 1, and engage the clip (B) which secures the air by-pass valve to the intake duct No. 1.
Tightening torque:
2.5 N.m (0.3 kgf-m, 1.8 ft-lb)
- Connect the vacuum control hose to the wastegate control solenoid valve.
- Connect the PCV pipe assembly to the intake duct No. 1.NOTE: Make sure that the blow-by diagnosis connector is connected securely.
- Connect the connector to the wastegate control solenoid valve.
- Connect the blow-by diagnosis connector (A) to the engine wiring harness, and connect the vacuum hose (B) to the vacuum pipe assembly.
- Install the under cover. Ref. to EXTERIOR/INTERIOR TRIM>Front Under Cover>INSTALLATION .
- Lower the vehicle.
- Install the air intake duct (rear). Ref. to INTAKE (INDUCTION) (H4DOTC)>Air Intake Duct>INSTALLATION .
- Connect the battery ground terminal. Ref. to NOTE>NOTE>BATTERY .