LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2017 >> Forester 2.0XT Touring >> Repair and Diagnosis >> Drivelines & Axles >> Wheel Hubs >> Axle Shafts, Propeller Shaft & Hubs >> Propeller Shaft >> Installation

Propeller Shaft: Installation

  1. Before installation, check the following items, and replace the propeller shaft assembly as necessary.
    • Dents or cracks on the tube surface
    • Splines for deformation or abnormal wear
    • Unsmooth joint operation or abnormal noise
    • Center bearing for free play, noise or non-smooth operation
    • Oil seals for abnormal wear or damage
    • Damaged center bearing
  2. Apply fluid or gear oil to the oil seal lip and the propeller shaft.

    Recommended fluid/oil: 

    Refer to the fluids in the RM information. Ref. to RECOMMENDED MATERIALS>FLUID .

  3. Insert the sleeve yoke into the transmission and attach center bearing to body.

    Tightening torque: 

    52 N.m (5.30 kgf-m, 38.4 ft-lb)

    Fig 1: Locating Center Bearing Bolts
    G09483288Courtesy of SUBARU OF AMERICA, INC.
  4. Align the alignment marks (A), and connect the yoke flange and rear differential.

    Tightening torque: 

    31 N.m (3.16 kgf-m, 22.9 ft-lb)

    Fig 2: Identifying Alignment Marks On Yoke Flange And Rear Differential
    G09483287Courtesy of SUBARU OF AMERICA, INC.
  5. Check the propeller shaft with the propeller shaft installed to the vehicle. Ref. to DRIVE SHAFT SYSTEM>Propeller Shaft>INSPECTION .
  6. Install the center exhaust cover.

    Tightening torque: 

    18 N.m (1.84 kgf-m, 13.3 ft-lb)

  7. Install the center exhaust pipe and rear exhaust pipe.
  8. Lower the vehicle.