DTC P2011 TGV Control Circuit/Open Bank 2: Wiring Diagram
WARNING: This page is about a different variant/trim than selected.
- Engine Electrical System ENGINE TYPE EJ (WITHOUT PUSH BUTTON START) Ref. to the appropriate SYSTEM WIRING diagram article. ENGINE TYPE EJ (WITHOUT PUSH BUTTON START).
- Engine Electrical System ENGINE TYPE EJ (WITH PUSH BUTTON START) Ref. to the appropriate SYSTEM WIRING diagram article. ENGINE TYPE EJ (WITH PUSH BUTTON START).
DIAGNOSTIC PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND TUMBLE GENERATOR VALVE ASSEMBLY LH CONNECTOR.
|
Is the resistance less than 1 Ω? | Go to step 2. | Repair the harness and connector.
NOTE:
In this case, repair the following item:
|
| 2 CHECK HARNESS BETWEEN ECM AND TUMBLE GENERATOR VALVE ASSEMBLY LH CONNECTOR. Measure the resistance between ECM connector and chassis ground. Connector & terminal (B134) No. 23 - Chassis ground: (B134) No. 24 - Chassis ground: |
Is the resistance 1 MΩ or more? | Go to step 3. | Repair the short circuit to ground in harness between ECM connector and tumble generator valve assembly LH connector. |
| 3 CHECK FOR POOR CONTACT. Check for poor contact of tumble generator valve assembly LH connector. |
Is there poor contact of the tumble generator valve assembly LH connector? | Repair the poor contact of tumble generator valve assembly LH connector. | Replace the tumble generator valve assembly LH. < Ref. to TUMBLE GENERATOR VALVE ASSEMBLY . > |