DTC P0453 EVAP System (CPC) Pressure Sensor/Switch Circuit High: Wiring Diagram
WARNING: This page is about a different variant/trim than selected.
- Engine Electrical System ENGINE TYPE EJ (WITHOUT PUSH BUTTON START) Ref. to the appropriate SYSTEM WIRING diagram article. ENGINE TYPE EJ (WITHOUT PUSH BUTTON START).
- Engine Electrical System ENGINE TYPE EJ (WITH PUSH BUTTON START) Ref. to the appropriate SYSTEM WIRING diagram article. ENGINE TYPE EJ (WITH PUSH BUTTON START).
DIAGNOSTIC PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND LEAK CHECK VALVE ASSEMBLY CONNECTOR.
|
Is the resistance less than 1 Ω? | Go to step 2. | Repair the harness and connector.
NOTE:
In this case, repair the following item:
|
| 2 CHECK FOR POOR CONTACT. Check for poor contact of ECM and the leak check valve assembly connector. |
Is there poor contact in ECM and the leak check valve assembly connector? | Repair the poor contact of ECM and the leak check valve assembly connector. | Go to step 3. |
| 3 CHECK LEAK CHECK VALVE ASSEMBLY. Check the pressure sensor of the leak check valve assembly. < Ref. to CHECK PRESSURE SENSOR , INSPECTION, Leak Check Valve Assembly. > |
Is the pressure sensor of the leak check valve assembly OK? | Repair the short circuit to power in harness between ECM connector and leak check valve assembly connector. | Replace the leak check valve assembly. < Ref. to LEAK CHECK VALVE ASSEMBLY . > |