LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2016 >> BRZ Series.HyperBlue >> Repair and Diagnosis >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> HVAC System (Heater, Ventilator And A/C) >> Air Conditioner Panel (For Manual Air Conditioning System) >> Installation

Air Conditioner Panel (For Manual Air Conditioning System): Installation

  1. Installation of air conditioner control assembly
    1. After positioning with the cable, engage the 2 claws and connect the heater control cable sub-assembly. (installed on the RH side)
    2. After positioning with the cable, engage the 2 claws and connect the heater control cable sub-assembly. (Installed on the LH side)
    3. Connect each connector.
    4. Install the 2 screws, engage the 6 claws, and install the air conditioner control assembly.
  2. Installation of instrument cluster finish panel garnish No. 1 (Refer to INSTALLATION )
  3. Installation of instrument cluster finish panel garnish No. 2 (Refer to INSTALLATION )
  4. Installation of instrument cluster finish panel sub-assembly CTR (Refer to INSTALLATION )
  5. Installation of console box assembly (Refer to DISASSEMBLY )