LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2016 >> BRZ Series.HyperBlue >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnostics (1 Of 3) >> DTC P0013 B Camshaft Position - Actuator Circuit/Open (Bank 1); DTC P0023 B Camshaft Position - Actuator Circuit/Open (Bank 2) >> Description of functions >> Inspection steps

Inspection steps

NOTE:
  • Read the freeze frame data using the SSM3. A part of the engine running conditions under which the engine trouble occurred is recorded in the freeze frame data, which is useful for troubleshooting.
  • Bank 1 shows the side where No. 1 cylinder is located.
  • Bank 2 shows the side where No. 2 cylinder is located.
  1. Clear DTC
    1. Connect the SSM3 to the DLC3.
    2. Turn the ignition switch to ON.
    3. Turn on the SSM3.
    4. Follow the SSM3 on-screen instructions to clear the DTCs. (Refer to CHECKING/CLEARING DTC )

      Next

  2. Read DTC
    1. Connect the SSM3 to the DLC3.
    2. Turn the ignition switch to ON.
    3. Turn on the SSM3.
    4. Follow the SSM3 on-screen instructions to check the DTC. (Refer to CHECKING/CLEARING DTC )

      Result

      Result Go to
      P0013 or P0023 is output. A
      No DTC is output. B

      B: Inspection for problems that do not normally occur (Refer to CHECKING/CLEARING DTC )

      A: Go to next step

  3. Camshaft timing oil control valve assembly unit inspection (exhaust side)
    1. Perform a unit inspection of camshaft timing oil control valve assembly. (Refer to UNIT INSPECTION )

      NG: Replacement of cam timing oil control valve assembly (exhaust side) (Refer to REMOVAL )

      OK: Go to next step

  4. Check wiring harness and connector (camshaft timing oil control valve assembly (exhaust side) power supply circuit)
    NOTE: For the inspection procedure and precautions for wiring harnesses and connectors, refer to INSPECTION PROCEDURES FOR ELECTRICAL CIRCUITS AND HOW TO PERFORM .
    1. Disconnect camshaft timing oil control valve assembly (exhaust side) connector.
    2. Measure the voltage between the terminals.

      Voltage

      TORQUE UP PROHIBITION REQUEST (EFI →VSC) ITEM DESCRIPTION

      Inspection terminals Inspection conditions Standard value
      C5-1 - chassis ground IG ON 11 to 14 V
      C23-1 - chassis ground IG ON 11 to 14 V
      Fig 1: Camshaft Timing Oil Control Valve Assembly (Exhaust Side) Connector End View (C5 Bank 1, C23 Bank 2)
      G10212763Courtesy of SUBARU OF AMERICA, INC.

      NG: Go to Step  6.

      OK: Go to next step

  5. Check wiring harness and connector (engine control computer - camshaft timing oil control valve assembly (exhaust side))
    NOTE: For the inspection procedure and precautions for wiring harnesses and connectors, refer to INSPECTION PROCEDURES FOR ELECTRICAL CIRCUITS AND HOW TO PERFORM .
    1. Disconnect the connector for the engine control computer.
    2. Disconnect camshaft timing oil control valve assembly (exhaust side) connector.
    3. Measure the resistance between the terminals. (Refer to for the TERMINAL ARRANGEMENT )

      Resistance (open circuit check)

      TORQUE UP PROHIBITION REQUEST (EFI →VSC) ITEM DESCRIPTION

      Inspection terminals Inspection conditions Standard value
      C36-7 (OE1) - C5-2 Always Less than 1 Ω
      C36-5 (OE2) - C23-2 Always Less than 1 Ω

      Resistance (short circuit check)

      TORQUE UP PROHIBITION REQUEST (EFI →VSC) ITEM DESCRIPTION

      Inspection terminals Inspection conditions Standard value
      C36-7 (OE1) and C5-2 - other terminals and chassis ground Always 10 k Ωor more
      C36-5 (OE2) and C23-2 - other terminals and chassis ground Always 10 k Ωor more

      NG: Repair or replacement of wiring harness or connector

      OK: Replacement of the engine control computer (Refer to REMOVAL )

  6. Relay unit inspection (EFI MAIN1 relay)
    1. Perform unit inspection of EFI MAIN1 relay. (Refer to RELAY )

      NG: Relay replacement (EFI MAIN1 relay)

      OK: Go to next step

  7. Check wiring harness and connector (EFI MAIN1 relay - camshaft timing oil control valve assembly (exhaust side))
    NOTE: For the inspection procedure and precautions for wiring harnesses and connectors, refer to INSPECTION PROCEDURES FOR ELECTRICAL CIRCUITS AND HOW TO PERFORM .
    1. Disconnect camshaft timing oil control valve assembly (exhaust side) connector.
    2. Remove the EFI MAIN1 relay from the engine compartment relay block.
    3. Measure the resistance between the terminals.

      Resistance (open circuit check)

      TORQUE UP PROHIBITION REQUEST (EFI →VSC) ITEM DESCRIPTION

      Inspection terminals Inspection conditions Standard value
      3 (EFI MAIN1 relay holder) - C5-1 Always Less than 1 Ω
      3 (EFI MAIN1 relay holder) - C23-1 Always Less than 1 Ω

      Resistance (short circuit check)

      TORQUE UP PROHIBITION REQUEST (EFI →VSC) ITEM DESCRIPTION

      Inspection terminals Inspection conditions Standard value
      3 (EFI MAIN1 relay holder) and C5-1 - other terminals and chassis ground Always 10 k Ωor more
      3 (EFI MAIN1 relay holder) and C23-1 - other terminals and chassis ground Always 10 k Ωor more
      CAUTION: When using tester probes to take measurements at a holder, do not push them hard against the holder. Otherwise the holder could be damaged.

      NG: Repair or replacement of wiring harness or connector

      OK: Inspection of the ECM power supply system (Refer to ECM POWER SUPPLY SYSTEM )