Unit Inspection
WARNING: This page is about a different variant/trim than selected.
- Transmission revolution sensor (SP2) check
- Measure the resistance between the terminals.
Resistance
| Inspection terminals |
Inspection conditions |
Standard value |
| Terminal 1 - terminal 2 |
20°C (68°F) |
560 to 680Ω |
Courtesy of SUBARU OF AMERICA, INC.
- Check of transmission revolution sensor (NT)
- Measure the resistance between the terminals.
Resistance
| Inspection terminals |
Inspection conditions |
Standard value |
| Terminal 1 - terminal 2 |
20°C (68°F) |
560 to 680Ω |
Courtesy of SUBARU OF AMERICA, INC.