LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2016 >> BRZ Premium >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Automatic Transmission (Diagnostics)) >> Automatic Transmission System >> DTC P2719 Pressure Control Solenoid "D" Control Circuit Range/Performance; DTC P2720 Pressure Control Solenoid "D" Control Circuit Low; DTC P2721 Pressure Control Solenoid "D" Control Circuit High >> Circuit description

Circuit description

WARNING: This page is about a different variant/trim than selected.

The line pressure control solenoid ASSY (SLT) is controlled according to the duty signal which is predetermined by the transmission control computer ASSY based on signals from the accelerator position sensor and the transmission revolution sensor (SP2, NT). This adjusts line pressure to meet the throttle opening angle and engine output. The transmission control computer ASSY detects slippage of clutch, etc. based on the revolution speed of the transmission revolution sensor (SP2, NT).

DTC DETECTION CONDITION

DTC No. SAE/TCCS DTC detecting condition
  1. Diagnosis condition
  2. Abnormal status
  3. Abnormal period
  4. Others
Inspection parts
P2719
  1. Learning control is not prohibited.
  2. The cumulative difference between line pressure control solenoid ASSY (SLT) operation set current and operation feedback current is 12 A or more.
  3. Abnormal status of No. 2 is detected 2 times consecutively.
  4. 1 trips
  • Line pressure control solenoid ASSY (SLT)
  • Transmission wire
  • Wiring harness or connector
  • Transmission control computer ASSY
P2720
  1. Learning control is not prohibited.
  2. Operation feedback voltage is less than 0.018 V after line pressure control solenoid ASSY is turned OFF and 1 second or more has passed.
  3. 100 ms or more durations are detected 5 times consecutively.
  4. 1 trips
  • Wiring harness and connector
  • Transmission wire
  • Line pressure control solenoid ASSY (SLT)
  • Transmission control computer ASSY
P2721
  1. Learning control is not prohibited.
  2. Operation feedback voltage is more than 0.257 V after line pressure control solenoid ASSY is turned ON and 1 second or more has passed.
  3. 100 ms or more durations are detected 5 times consecutively.
  4. 1 trips
  • Wiring harness and connector
  • Transmission wire
  • Line pressure control solenoid ASSY (SLT)
  • Transmission control computer ASSY