LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2016 >> BRZ Premium >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Automatic Transmission (Diagnostics)) >> Automatic Transmission System >> DTC P0722 Output Speed Sensor Circuit No Signal >> Inspection steps

Inspection steps

WARNING: This page is about a different variant/trim than selected.
NOTE: Read the freeze frame data using the SSM3. A part of the engine running conditions under which the engine trouble occurred is recorded in the freeze frame data, which is useful for troubleshooting.
  1. Check of transmission revolution sensor (SP2) installation condition
    1. Check the installation condition of the transmission revolution sensor (SP2).

      Criteria: The mounting bolt is not loosened and the sensor is not lifted or tilted.

      Fig 1: Checking Transmission Revolution Sensor Installation Condition
      G10214194Courtesy of SUBARU OF AMERICA, INC.

      NG: Repair of installation condition or replacement of transmission revolution sensor (SP2) (refer to REMOVAL )

      OK: Go to next step

  2. Check of transmission revolution sensor (SP2) unit
    1. Disconnect the connector L3 of the transmission revolution sensor (SP2).
    2. Check the transmission revolution sensor (SP2) unit. (Refer to INSTALLATION )
    3. Connect the connector L3 of the transmission revolution sensor (SP2).

      NG: Replacement (SP2)of transmission revolution sensor (SP2) (refer to REMOVAL )

      OK: Go to next step

  3. Check wiring harness and connector (transmission control computer ASSY - transmission revolution sensor (SP2))
    NOTE: Refer to INSPECTION PROCEDURES FOR ELECTRICAL CIRCUITS AND HOW TO PERFORM for checking procedure and precautions of wiring harness and connector
    1. Disconnect the connector A19 of the transmission control computer ASSY.
    2. Disconnect the connector L3 of the transmission revolution sensor (SP2).
    3. Measure the resistance between the terminals. (ECM TERMINAL ARRANGEMENT  for terminal arrangement of transmission control computer ASSY)

      Resistance

      Inspection terminals Inspection conditions Standard value
      A19-18 (SP2+) - L3-1 (SP2+) Always Less than 1 Ω
      A19-7 (SP2-) - L3-2 (SP2-) Always Less than 1 Ω
      A19-18 (SP2+) - chassis ground Always 10 kΩ or more
      A19-7 (SP2-) - chassis ground Always 10 kΩ or more
    4. Connect the connector L3 of the transmission revolution sensor (SP2).
    5. Connect the connector A19 of the transmission control computer ASSY.

      NG: Repair or replacement of wiring harness or connector (transmission control computer ASSY - transmission revolution sensor)

      OK: Go to next step

  4. Replacement of transmission control computer ASSY
    1. Replace the transmission control computer ASSY. (Refer to TRANSMISSION CONTROL COMPUTER ASSY )

      Next

      AT unit correction (refer to INSPECTION FOR PROBLEMS THAT DO NOT NORMALLY OCCUR  )