Intake Duct No. 1
- Install the intake duct No. 1 to the turbocharger.NOTE:
- Use new O-rings.
- Be careful not to pinch the O-ring.
- Check that the air by-pass valve is firmly inserted into the intake duct No. 1.
Tightening torque:
6.4 N.m (0.7 kgf-m, 4.7 ft-lb)
- Engage the clip which secures the air by-pass valve to the intake duct No. 1, and install the air intake boot to the intake duct No. 1.
Tightening torque:
2.5 N.m (0.3 kgf-m, 1.8 ft-lb)
- Connect the PCV pipe (A) to the intake duct No. 1, and connect the vacuum control hose (B) to the wastegate control solenoid valve.
- Connect the connector to the wastegate control solenoid valve.
- Install the under cover. <Ref. to INSTALLATION , Front Under Cover.>
- Lower the vehicle.
- Connect the vacuum hose to the vacuum pipe.
- Install the air intake duct. <Ref. to INSTALLATION , Air Intake Duct.>
- Connect the ground terminal to battery sensor. <Ref. to BATTERY , NOTE, Note.>
- Install the collector cover. <Ref. to INSTALLATION , Collector Cover.>