Unit Inspection
WARNING: This page is about a different variant/trim than selected.
- Check of clutch control solenoid No. 1 (SL2)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Clutch control solenoid No. 1 (SL2) terminal 1 - terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect the battery positive to terminal 1 of the clutch control solenoid No. 1 (SL2) via the 12 V-21 W valve and check that the valve in the solenoid operates when connecting the battery ground to terminal 2.
Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of lock-up control solenoid (SLU)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Lock-up control solenoid (SLU) terminal 1 - terminal 2 320°C (68°F) 5.0 to 5.6 Ω - Connect the battery positive to terminal 2 of the lock-up control solenoid (SLU) via the 12 V-21 W valve and check that the valve in the solenoid operates when connecting the battery ground to terminal 1.
Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of line pressure control solenoid ASSY (SLT)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Line pressure control solenoid ASSY (SLT) terminal 1 - terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect the battery positive to terminal 2 of the line pressure control solenoid ASSY (SLT) via the 12 V-21 W valve and check that the valve in the solenoid operates when connecting the battery ground to terminal 1.
Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of clutch control solenoid No. 1(SL1)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Clutch control solenoid No. 1 (SL1) terminal 1 - terminal 2 20°C (68°F) 5.0 to 5.6 Ω - Connect the battery positive to terminal 1 of the clutch control solenoid No. 1 (SL1) via the 12 V-21 W valve and check that the valve in the solenoid operates when connecting the battery ground to terminal 2.
Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of transmission 3 way solenoid ASSY (SR)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Transmission 3 way solenoid ASSY (SR) connector - body 20°C (68°F) 11 to 15 Ω - Connect the battery positive to the connector of the transmission 3 way solenoid ASSY (SR) and check that the valve in the solenoid operates when connecting the battery ground to the solenoid body.
Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of transmission 3 way solenoid ASSY (S1)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Transmission 3 way solenoid ASSY (S1) connector - body 20°C (68°F) 11 to 15 Ω - Connect the battery positive to the connector of the transmission 3 way solenoid ASSY (S1) and check that the valve in the solenoid operates when connecting the battery ground to the solenoid body. Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of transmission 3 way solenoid ASSY (S4)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Transmission 3 way solenoid ASSY (S4) connector - body 20°C (68°F) 11 to 15 Ω - Connect the battery positive to the connector of the transmission 3 way solenoid ASSY (S4) and check that the valve in the solenoid operates when connecting the battery ground to the solenoid body. Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of transmission 3 way solenoid ASSY (S2)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Transmission 3 way solenoid ASSY (S2) connector - body 20°C (68°F) 11 to 15 Ω - Connect the battery positive to the connector of the transmission 3 way solenoid ASSY (S2) and check that the valve in the solenoid operates when connecting the battery ground to the solenoid body. Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.
- Check of transmission 3 way solenoid ASSY (S3)
- Measure the resistance between the terminals.RESISTANCE
Inspection terminals Inspection conditions Standard value Transmission 3 way solenoid ASSY (S3) connector - body 20°C (68°F) 11 to 15 Ω - Connect the battery positive to the connector of the transmission 3 way solenoid ASSY (S3) and check that the valve in the solenoid operates when connecting the battery ground to the solenoid body. Criteria: Operates (with operating noise)
- Measure the resistance between the terminals.