LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2013 >> Legacy Premium, Automatic CVT Trans >> Repair and Diagnosis >> Accessories & Equipment >> Communication Devices >> LAN Communication System (Diagnostics) >> CAN Communication Circuit Check >> Inspection >> Ground Short Inspection (Bus "A" (Main-Can)) >> Wiring Diagram

Ground Short Inspection (Bus "A" (Main-Can)): Wiring Diagram

CAN communication system. See appropriate SYSTEM WIRING DIAGRAM article.

Fig 1: CAN Communication System - Wiring Diagram (Main-CAN)
G08585506Courtesy of SUBARU OF AMERICA, INC.
NOTE: Main wiring harness or related lines may be shorted to ground, or shorted to ground in one of the control modules.
Step Check Yes No
1 CHECK BETWEEN RELATED LINES AND MAIN WIRING HARNESS. 
Using the tester, measure the resistance between terminals.
Connector & terminal 
(B40) No. 6 - Chassis ground: 
(B40) No. 14 - Chassis ground: 
Is the resistance 10 Ω or less? Go to step . Currently, it is normal.
2 CHECK CONTROL MODULE. 
With the tester connected, disconnect control module.
NOTE: Disconnect the body integrated unit at the end.

Connector & terminal 
(B40) No. 6 - Chassis ground: 
(B40) No. 14 - Chassis ground: 
Did the resistance change to 10 Ω or more? Replace the control module whose resistance has changed. When the value changed at disconnecting the body integrated unit, Go to step . Repair or replace the short circuit of the main wiring harness and related lines between body integrated unit and VDC CM.
3 CHECK BETWEEN MAIN WIRING HARNESSES. 
Using the tester, measure the resistance between terminals.
Connector & terminal 
(i84) No. 27 - Chassis ground: 
(i84) No. 35 - Chassis ground: 
Is the resistance 10 Ω or less? Repair or replace the short circuit of the main wiring harness and related lines between body integrated unit and ECM. Replace the body integrated unit. Refer to REMOVAL .