LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2012 >> Forester XT Premium >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Engine Intake System (Induction) And Turbocharger (H4DOTC) >> Air By-pass Valve >> Installation

Air By-pass Valve: Installation

Install in the reverse order of removal.

NOTE:
  • Use new O-rings.
  • Be careful not to pinch the O-ring.

Tightening torque: 

6.5 N.m (0.7 kgf-m, 4.8 ft-lb)