DTC P2420 Evaporative Emission System Switching Valve Control Circuit High: Wiring Diagram
WARNING: This page is about a different variant/trim than selected.
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND PURGE CONTROL SOLENOID VALVE 2 CONNECTOR.
|
Is the voltage 10 V or more? | Repair the short to power in the harness between ECM and purge control solenoid valve 2 connector. | Go to step 2 . |
2 CHECK PURGE CONTROL SOLENOID VALVE 2.
|
Is the resistance less than 1 Ω? | Replace the purge control solenoid valve 2. Refer to EC(H4DOTC)-9, Purge Control Solenoid Valve. | Repair the poor contact of ECM connector. |