LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2011 >> Legacy Premium, Automatic CVT >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 6 (Engine Mechanical (H4DOTC)) >> Preparation for Overhaul >> Procedure

Preparation for Overhaul: Procedure

WARNING: This page is about a different variant/trim than selected.
  1. After removing the engine from vehicle body, attach the ST to the engine as shown in the figure.

    ST1 498457000 ENGINE STAND ADAPTER RH

    ST2 498457100 ENGINE STAND ADAPTER LH

    ST3 499817100 ENGINE STAND

    Fig 1: Attaching Tool To V-Belt Tensioner Assembly
    G04998651Courtesy of SUBARU OF AMERICA, INC.
  2. In this section the procedures described under each index are all connected and stated in order. Engine overhaul will be completed when you go through all steps in the procedure.

Therefore, in this section, to conduct the particular procedure within the flow of a section, you need to go back and conduct the procedure described previously in order to do that particular procedure.