DTC P0459 Evaporative Emission System Purge Control Valve Circuit High: Wiring Diagram
WARNING: This page is about a different variant/trim than selected.
DIAGNOSTIC PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND PURGE CONTROL SOLENOID VALVE.
Connector & terminal (B137) No. 6 (+) - Chassis ground (-): |
Is the voltage 10 V or more? | Repair the short circuit of harness to power supply between ECM and purge control solenoid valve connector. | Go to step 2. |
2 CHECK PURGE CONTROL SOLENOID VALVE.
Terminals No. 1 - No. 2: |
Is the resistance less than 1 Ω? | Replace the purge control solenoid valve. Ref. to PURGE CONTROL SOLENOID VALVE . | Repair the poor contact of ECM connector. |