DTC P0448 Evaporative Emission Control System Vent Control Circuit Shorted: Wiring Diagram
WARNING: This page is about a different variant/trim than selected.
DIAGNOSTIC PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND DRAIN VALVE CONNECTOR
.
|
Is the voltage 10 V or more? | Repair the short circuit to power in the harness between ECM and drain valve connector. | Go to step 2 . |
2 CHECK DRAIN VALVE
.
|
Is the resistance less than 1 Ω? | Replace the drain valve. Ref. to DRAIN VALVE . | Repair the poor contact of ECM connector. |