ATF Cooler Pipe and Hose: Installation
WARNING: This page is about a different variant/trim than selected.
- Install the oil cooler inlet and outlet pipes with new washers.
Tightening torque:
T1:25 N.m (2.5 kgf-m, 18 ft-lb)
T2:40 N.m (4.1 kgf-m, 29.5 ft-lb)
T3: 44 N.m (4.5 kgf-m, 32.5 ft-lb)
- Install the ATF cooler pipe to frame.
- Connect the ATF cooler hose to the pipe on the transmission side.
- Connect the ATF cooler hose to the pipe on the radiator side.
- Install the radiator under cover.
- Install the under cover.
- Install the battery.
- Fill the ATF. < Ref. to
AUTOMATIC TRANSMISSION FLUID . >NOTE: Make sure there are no ATF leaks in joints between the transmission, radiator, pipes, and hoses.