Back-Up Light Switch And Neutral Position Switch
WARNING: This page is about a different variant/trim than selected.
- Install the back-up light switch and neutral position switch with harness.
Tightening torque:
32.3 N.m (3.3 kgf-m, 24 ft-lb)
- Connect the connector of back-up light switch and neutral position switch.
- Install the air intake duct and cleaner case or the air intake chamber. (Non-TURBO model) < Ref. to INSTALLATION , AIR CLEANER CASE > and < Ref. to INSTALLATION , AIR INTAKE DUCT. >
- Install the intercooler. (Turbo model)
< Ref. to INSTALLATION , INTERCOOLER. >
- Connect the battery ground cable to battery.