LEMON Manuals: Even more car manuals for everyone
Home >> Subaru >> 2006 >> Baja Turbo, Automatic >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 12 (Starting/Charging Systems (H4SO)) >> Starter >> Inspection >> Magnetic Switch

Magnetic Switch

WARNING: This page is about a different variant/trim than selected.
CAUTION:
  • The following magnetic switch tests should be performed with specified voltage applied.
  • Each test should be conducted within 3 to 5 seconds. Power to be furnished should be one-half the rated voltage.
  1. Pull-in test

    Connect two battery negative leads onto magnetic switch body and terminal C respectively. Then connect battery positive lead onto terminal 50. Pinion should extend when lead connections are made.

    Fig 1: Checking Magnetic Switch
    G04988672Courtesy of SUBARU OF AMERICA, INC.
  2. Holding-in test

    Disconnect lead from terminal C with pinion extended. Pinion should be held in the extended position.

    Fig 2: Checking Magnetic Switch
    G04988673Courtesy of SUBARU OF AMERICA, INC.
  3. Return test

    Connect two battery negative leads onto terminal 50 and onto switch body respectively. Then connect battery positive lead onto terminal C. Next, disconnect lead from terminal 50. Pinion should return immediately.

    Fig 3: Checking Magnetic Switch
    G04988674Courtesy of SUBARU OF AMERICA, INC.