Operation Check
NOTE:
Perform operation checks before installing new parts.
- Align point of ELR assembly with floor tunnel and temporarily install ELR assembly. Check that shoulder belt winds and unwinds properly.
- Gradually tilt ELR assembly. Check that ELR locks so that belt cannot be withdrawn when ELR is tilted 45° or more in relation to standard installation angle, and that ELR unlocks when it is tilted within 15°.