Preparing Roof Paneling For Installation - Ar65.10-P-5702-02SR
Model 453.3
with code E23 (solid roof)
MODIFICATION NOTES
| 21.08.2017 | Workshop equipment is linked in EPC with replacement part. | Only use linked workshop equipment. |
Kit adhesive (with heptane cleaner)
- Position two cup suction tolls at top of roof paneling (1).
- Clean bonding area of roof paneling (1) with heptane cleaner 3350 (7).
The gluing area on the roof paneling (1) must be absolutely free of dust and grease.
Dirt can lead to paint adhesion problems of adhesive material.
- Coat bonding area on roof paneling (1) with plastic primer (5).
Allow plastic primer (5) to flash off for min. 10 to 15 minutes.