Apply Adhesive Material - Ar65.10-P-5702-05SR
Model 453.3
with code E23 (solid roof)
MODIFICATION NOTES
| 17.08.2017 | Workshop equipment is linked in EPC with replacement part. | Only use linked workshop equipment. |
Roof paneling (3) must be mounted within 2 min of adhesive material application on roof frame.
Otherwise adhesion problems can occur.
Durability is achieved after approx. 2 hours measured from the time the roof paneling (3) is installed. The nominal strength is achieved only after approx. 8 h.
- Cut application nozzle (2) to size so that a uniform bead with a height (b) of approx. 12 mm and a width of approx. 8 mm can be applied.
- Apply adhesive material (2) to roof paneling (1) as shown.
Workshop equipment is linked in EPC with replacement part.
Completely press out glue not required immediately following application (disposal).