Timing - BE05.20-P-1000-02L
WARNING: This page does not describe the selected car, but rather 33 other vehicles, including the 2016 Mercedes-Benz E63 S AMG, 2016 Mercedes-Benz E400, 2016 Mercedes-Benz E350, 2016 Mercedes-Benz E300, and 2016 Mercedes-Benz E250. However, it is still accessible from the selected car via links, so may be relevant.
ENGINE 272
TIMING
| Number | Designation | Engine 272.911/920/921/922/ 923/924/940/941/942/ 943/944/945/946/947/ 948/949/952/960/961/ 963/964/965/966/967/ 970/971/972/973/974/ 975/977/978/979/980 | Engine 272.985 | |||
|---|---|---|---|---|---|---|
| BE05.20-P-1001-02L | Left/right bank cylinder head, timing at 2 mm valve lift and new timing chain | Inlet valve | opens after TDC...before TDC | °KW | 36 to 4 | 36 to 4 |
| closes after BDC...after BDC | °KW | 47.7 to 7.7 | 47 to 7 | |||
| Outlet valve | opens after BDC...before BDC | °KW | 9 to 31 | -0.2...40.2 | ||
| closes after TDC...before TDC | °KW | 20 to 20 | 15 to 25 | |||
| BE05.20-P-1002-02L | Left bank cylinder head, timing at 2 mm valve lift and used timing chain | Inlet valve | opens after TDC...before TDC | °KW | 37 to 3 | 37 to 3 |
| closes after BDC...after BDC | °KW | 48.7 to 8.7 | 48 to 8 | |||
| Outlet valve | opens after BDC...before BDC | °KW | 10 to 30 | 0.8 to 39.2 | ||
| closes after TDC...before TDC | °KW | 21 to 19 | 16 to 24 | |||
| BE05.20-P-1003-02L | Right bank cylinder head, timing at 2 mm valve lift and used timing chain | Inlet valve | opens after TDC...before TDC | °KW | 38.2 to 1.8 | 38.2 to 1.8 |
| closes after BDC...after BDC | °KW | 49.9 to 9.9 | 49.9 to 9.2 | |||
| Outlet valve | opens after BDC...before BDC | °KW | 11.2 to 28.8 | 2 to 38 | ||
| closes after TDC...before TDC | °KW | 22.2 to 17.8 | 17.2 to 22.8 | |||
TIMING
| Number | Designation | Engine 272.968/969 | |||
|---|---|---|---|---|---|
| BE05.20-P-1001-02L | Left/right bank cylinder head, timing at 2 mm valve lift and new timing chain | Inlet valve | opens after TDC...before TDC | °KW | 31 to 9 |
| closes after BDC...after BDC | °KW | 42.7 to 2.7 | |||
| Outlet valve | opens after BDC...before BDC | °KW | 4 to 36 | ||
| closes after TDC...before TDC | °KW | 15 to 25 | |||
| BE05.20-P-1002-02L | Left bank cylinder head, timing at 2 mm valve lift and used timing chain | Inlet valve | opens after TDC...before TDC | °KW | 32 to 8 |
| closes after BDC...after BDC | °KW | 43.7 to 3.7 | |||
| Outlet valve | opens after BDC...before BDC | °KW | 5 to 35 | ||
| closes after TDC...before TDC | °KW | 14 to 24 | |||
| BE05.20-P-1003-02L | Right bank cylinder head, Inlet valve timing at 2 mm valve lift and used timing chain | Inlet valve | opens after TDC...before TDC | °KW | 33.2 to 6.8 |
| closes after BDC...after BDC | °KW | 44.9 to 4.9 | |||
| Outlet valve | opens after BDC...before BDC | °KW | 6.2 to 33.8 | ||
| closes after TDC...before TDC | °KW | 17.2 to 22.8 | |||