Notes on application of sealant to cylinder shutoff oil pump - AH01.30-P-1000-01A
ENGINE 137.970
Sealant path from oil pump to CSO
The timing case cover is sealed using a silicone sealant at the positions F
.
Apply sealant along specified line (F) only with a bead of 2.0 mm ±0.5 mm. The sealant must be applied within 10 minutes. The silicone bead should not be spread. Only the approved silicone sealant may be used.