Installation [05/2013 - ]
- INSTALL COMBINATION METER ASSEMBLY
- Connect the 2 connectors.
- Engage the 2 clips.
- Install the combination meter with 2 screws.
- INSTALL INSTRUMENT CLUSTER FINISH NO. 1 PANEL . Refer to INSTALLATION [05/2013 - ] - Step 27
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
NOTE:When the power to the combination meter is disconnected and reconnected, it will not function normally until 5 minutes elapse or a vehicle speed signal is input.