LEMON Manuals: Even more car manuals for everyone
Home >> Scion >> 2006 >> xB Automatic >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter >> Meter / Gauge System >> Entire Combination Meter does not Operate >> Inspection Procedure

Inspection Procedure

  1. INSPECT FUSE (GAUGE, DOME, AM2) 
    1. Remove the GAUGE fuse from the instrument panel junction block.
    2. Remove the DOME and AM2 fuses from the engine room relay block.
    3. Measure the resistance of the fuses.

      Standard resistance: 

      Below 1 Ω 

    NG : REPLACE FUSE 

    OK : Go to Next Step 

  2. CHECK WIRE HARNESS (COMBINATION METER - BATTERY AND BODY GROUND) 
    1. Disconnect the C6 meter connector.
    2. Measure the voltage of the wire harness side connector.

      Standard voltage 

      TESTER CONNECTION SPECIFIED CONDITION

      Tester Connection Condition Specified Condition
      C6-1 - Body ground Always 10 to 14 V
      C6-23 - Body ground Ignition switch ON
      Ignition switch OFF Below 1 V
      C6-40 - Body ground Ignition switch ON 10 to 14 V
      Ignition switch OFF Below 1 V
      Fig 1: Identifying C6 Meter Connector Terminal
      G04229329Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Measure the resistance of the wire harness side connector.

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION

      Tester Connection Specified Condition
      C6-21 - Body ground Below 1 Ω

    NG : REPAIR OR REPLACE HARNESS AND CONNECTOR 

    OK : REPLACE COMBINATION METER ASSEMBLY