Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install a NEW oil pressure test plug and tighten to 11 N.m (97 lb in).
- Check the transmission fluid level (fill if necessary). Refer to Transmission Fluid Level and Condition Check .
- Install the front closeout panel. Refer to Floor Panel Tunnel Panel Replacement - Front (Automatic Transmission) .
- Lower the vehicle.
CAUTION:
Refer to Fastener Caution
.