1-2, and 3-4 Accumulator Assemblies
WARNING: This page is about a different variant/trim than selected.
Accumulator fluid is routed to each of the accumulator assemblies in preparation for upshifts. The fluid which is routed to the 1-2 and to the 3-4 accumulators is orificed by the #4 and the #7 checkballs. The 2-3 accumulator fluid circuit does not use a checkball in order to orifice accumulator fluid to the 2-3 accumulator.