I/P Cluster: Installation
- Install I/P cluster into I/P housing ensuring that the cluster harness is connected. Install and tighten fasteners. Tighten I/P cluster trim plate-to-I/P housing fasteners to 2.5 N.m (22 in-lbs).
- Install I/P cluster trim plate. Refer to I/P CLUSTER TRIM PLATE procedure.
- Enable the SIR System. Refer to ACTIVATING SYSTEM procedure.