Preparing Connection Areas Of Body For Installing Side Section Lower Part
- Align the sealing surface and connections of the body.
- De-burr connection points and prepare them for bonding.
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive.
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed.
- Do not begin bonding work until all materials and tools necessary for later repair work are available.
- Only for Panamera Saloon
Prepare the marked area -A- for joining.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE
Connection areas of body
- Prepare the marked areas for joining.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE
Connection areas of body
Connection areas of body
Connection areas of body