LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2024 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 10 (15 Engine - Cylinder Head, Valve Drive 3.0L -- 95B - MACAN (95B)) >> WM, 158219 - Removing And Installing Cylinder Head Cover (V6 Turbo) >> Preliminary Work >> Preliminary Work - Right Cylinder Bank

Preliminary Work - Right Cylinder Bank

WARNING: This page is about a different car, the 2021 Porsche Macan, 2020 Porsche Macan, and 2019 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove timing chain.

    > 153519 - REMOVING AND INSTALLING TIMING CHAIN (V6 TURBO) 

  2. Remove tank vent valve.

    > 202319 - REMOVING AND INSTALLING TANK VENT VALVE (V6 TURBO)

  3. Remove fuel injectors.

    > 244019 - REMOVING AND INSTALLING FUEL INJECTOR (V6 TURBO)

  4. Remove the high-pressure pump.

    > 246319 - REMOVING AND INSTALLING HIGH-PRESSURE PUMP (V6 TURBO)

  5. Remove hydraulic valve for valve li ft  switchover.

    > 155519 - REMOVING AND INSTALLING HYDRAULIC VALVE FOR VALVE LIFT SWITCHOVER (V6 TURBO) 

  6. Remove lower part of sound insulation.