LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2024 >> Macan Base >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> 19 Engine - Cooling 2.0L -- 95B - MACAN (95B) >> WM, 196119 - Removing And Installing (Engine) Coolant Pipe (R4) >> Install Coolant Pipe (Engine) >> Installing Centre Coolant Pipe (Engine) At The Left

Installing Centre Coolant Pipe (Engine) At The Left

  1. Installation is performed in reverse order. Pay particular attention to the following:
    1. 1.1  Screw in and tighten screw -4-  .

      > Tightening - torque 9 Nm (6.5 ftlb.) 

      G15145164Courtesy of PORSCHE CARS NORTH AMERICA, INC.

      Electric plug connections

    2. 1.2  Screw in and tighten screw -5-  .

      Tightening torque 9 Nm (6.5 ftlb.) 

      G15145165Courtesy of PORSCHE CARS NORTH AMERICA, INC.

      Left coolant pipe