LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Taycan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 63 (24 Fuel System - Electronic Injection 2.9L Turbo Hybrid -- 971 - PANAMERA (971)) >> WM, 244019 Removing And Installing Injector Valve (Injector) >> Preliminary Work

Preliminary Work

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2023 Porsche Panamera, 2022 Porsche Panamera, 2021 Porsche Panamera, 2020 Porsche Panamera, and 2019 Porsche Panamera. However, it is still accessible from the selected car via links, so may be relevant.

Information 

The steps required for removal are shown on one side. The steps required for removal are identical on both sides.

  1. Remove spark plugs.

    > 287020 REMOVE AND INSTALL SPARK PLUGS

  2. Remove fuel collection pipe.

    > WM, 243019 REMOVING AND INSTALLING FUEL COLLECTION PIPE (V6 TURBO) 

  3. Remove sound absorber -1-  .
    G15878007Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Sound absorber

  4. Spray fuel injector valves in the cylinder head with Caramba EDI special solvent for injectors and leave it to take effect.