LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Taycan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 53 (15 Engine - Cylinder Head, Valve Drive 2.9L Turbo Gas -- 971 - PANAMERA (971)) >> WM, 157019 Removing And Installing Cylinder Head >> Installing Cylinder Head >> Installing Cylinder Head - Right Cylinder Bank

Installing Cylinder Head - Right Cylinder Bank

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2023 Porsche Panamera, 2022 Porsche Panamera, 2021 Porsche Panamera, 2020 Porsche Panamera, and 2019 Porsche Panamera. However, it is still accessible from the selected car via links, so may be relevant.
  1. Installation is performed in reverse order. Pay particular attention to the following:
    1. 1.1 The cylinder-head gasket must be replaced following removal.
    2. 1.2 The cylinder-head screws must be replaced following removal.
    3. 1.3 All sealing faces must be clean and free of grease.
    4. 1.4 Screw in cylinder-head screws as far as they will go by hand and tighten according to the specified tightening sequence.
      1. 1.4.1 Tighten screws on the cylinder head -1 to 8-  to > Initial tightening 30 Nm (22 ftlb.)  .
      2. 1.4.2 Tighten screws on the cylinder head -1 to 8-  to > Tightening torque 50 Nm (37 ftlb.)  .
      3. 1.4.3 Tighten screws on the cylinder head -1 to 8-  to > Torque angle + 90°  .
      4. 1.4.4 Tighten screws on the cylinder head -1 to 8-  to > Final tightening + 90°  .
      5. 1.4.5 Tighten screw on the cylinder head -9-  to > Initial tightening 10 Nm (7.5 ftlb.)  .
      6. 1.4.6 Tighten screw on the cylinder head -10-  to > Initial tightening 8 Nm (6 ftlb.)  .
      7. 1.4.7 Tighten screw on the cylinder head -9-  to > Torque angle + 90°  .
      8. 1.4.8 Tighten screw on the cylinder head -10-  to > Torque angle + 90°  .
    5. 1.5 Tighten screws securing coolant line holder to additional coolant pump to > Tightening torque 9 Nm (6.5 ftlb.)  .
    6. 1.6 Tighten screw securing coolant flange to additional coolant pump to > Tightening torque 9 Nm (6.5 ftlb.)  .
    7. 1.7 Tighten screw for side coolant pipe to > Tightening torque 9 Nm (6.6 ftlb.)  .
    8. 1.8 Tighten screw for front coolant pipe to > Tightening torque 9 Nm (6.6 ftlb.)  .
Fig 1: Cylinder Head On Right Cylinder Bank Screws Tightening Sequence
G15822319Courtesy of PORSCHE CARS NORTH AMERICA, INC.

Tightening sequence for cylinder head on right cylinder bank