LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Taycan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 41 (19 - Engine - Cooling 2.9L Turbo Gas -- 971 - PANAMERA (971)) >> WM, 194019 Removing And Installing Coolant Reservoir >> Preliminary Work

Preliminary Work

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2023 Porsche Panamera, 2022 Porsche Panamera, 2021 Porsche Panamera, 2020 Porsche Panamera, and 2019 Porsche Panamera. However, it is still accessible from the selected car via links, so may be relevant.
  1. Disconnect the battery.

    > 2X00IN WORK INSTRUCTIONS AFTER DISCONNECTING THE BATTERY

  2. Remove cover for front lock support.

    > WM, 703919 REMOVING AND INSTALLING COVER FOR FRONT LOCK SUPPORT - Coupe or WM, 703919 REMOVING AND INSTALLING COVER FOR FRONT LOCK SUPPORT

  3. Remove front trim panel (engine compartment) at the right.

    > WM, 700219 REMOVING AND REINSTALLING FRONT TRIM PANEL (ENGINE COMPARTMENT) - Coupe or WM, 700219 REMOVING AND REINSTALLING FRONT TRIM PANEL (ENGINE COMPARTMENT) - Wagon

  4. Drain coolant.

    > 193817 DRAINING AND FILLING COOLANT (INCLUDES BLEEDING) 

  5. Disconnect electric lines on strut -4-  .
    1. 5.1 Unscrew nut -1-  and set bracket -2-  with electric lines aside.
    2. 5.2 Unclip electric line -3-  from the strut -4-  .
    G15822485Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Loosening bracket and unclipping electric line

  6. Remove strut -4-  .
    1. 6.1 Unscrew screw -5-  and -6-  and remove strut -4-  .
    G15822486Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Removing strut