Install E-Box
- Electric shock
- Short circuit
- Fire
- Explosion
→ Only appropriately trained and authorized persons may work on high-voltage vehicles and components.
→ Required qualification: High voltage technician or high voltage expert.
→ Observe national requirements and legislation for this work.
→ Always use insulated tools, such as an > VAS 6883 - insulated tool set when working on these parts.
→ Observe general warning notices for working on the high-voltage system.
> WM, 2X00IN GENERAL WARNING NOTES FOR WORKING ON THE HIGH-VOLTAGE SYSTEM
- Install E-box.
- 1.1 Replace seals.
- 1.2 Carefully position E-box.
- 1.3 Screw in fastening screw -4-
.
Replace micro-self-locking screw.
Loosening E-box
Information
Immediately after removing a centring pin, screw in and fit the fastening screw.
- 1.4 > 9924 - Centring pins-3-
must now be unscrewed.
Centring pins on E-box
- 1.5 Screw in -1-
fastening screws.
Replace micro-self-locking screws.
Fastening screws on E-box
- 1.6 Fit fastening screws securing E-box to high-voltage battery and tighten to > Tightening torque 8 Nm (6 ftlb.) .
- Perform leak test on the battery housing using > 9925 - leak-tightness test set , > T40349 - seal plug , > T40354 - seal plug and > VAS 6213 - Hand vacuum pump .
- Fit pressure accumulator and load distributor plate.
- 3.1 Position load distributor plate together with lower bar on the high-voltage battery.
- 3.2 Position retaining frame together with the pressure accumulator on the high-voltage battery.
- 3.3 Fit fastening screws -6-
and tighten to > Tightening torque 8 Nm (6 ftlb.)
.
Fastening screws on retaining frame, bottom
- 3.4 Fit fastening screws -5-
and tighten to > Tightening torque 8 Nm (6 ftlb.)
.
Fastening screws on pressure accumulator, bottom
- Secure retaining frame at the top.
- 4.1 Fit fastening screws -4-
and tighten to > Tightening torque 8 Nm (6 ftlb.)
.
Fastening screws on retaining frame
- 4.2 Screw in fastening screws -A to D and 1 to 12- by a couple of turns.
- 4.3 Fit fastening screws -A, B, C and D- in this sequence and tighten to > Tightening torque 28 Nm (21 ftlb.) +/- 2 Nm (1.5 ftlb.) .
- 4.4 Fit fastening screws (M8 x 30) -1, 2, 3 and 4- in this sequence and tighten to > Tightening torque 20 Nm (15 ftlb.) .
- 4.5 Fit fastening screws (M8 x 18) -5, 6, 7, 8, 9, 10, 11 and 12-
in this sequence and tighten to > Tightening torque 20 Nm (15 ftlb.)
.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Tightening sequence for battery console at top of HV battery
- 4.1 Fit fastening screws -4-
and tighten to > Tightening torque 8 Nm (6 ftlb.)
.