Preparing Connection Areas Of The Body For Installation
- Align contact surfaces and connections of the body.
- Prepare inner connection areas.
Inner connection areas
- 2.1 Prepare areas -A- for spot welding
- 2.2 Prepare areas -B-
for bonding and resistance spot-welding.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- 2.3 Prepare areas -C-
for bonding and riveting.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- 2.4 Prepare areas -D- for gas-shielded full-seam welding.
- Prepare connection areas -B-
for resistance spot welding and bonding.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Outer connection areas