Installing Starter (V6 Turbo)
WARNING: This page is about a different variant/trim than selected.
Installation is performed in reverse order. Pay particular attention to the following:
- Tighten new screw -5-
.
- Tightening torque 65 Nm (48 ftlb.)
- Tighten new screw -4-
.
- Initial tightening 30 Nm (22 ftlb.)
- Final tightening + 105°
- Tighten nut -2-
.
- Tightening torque 23 Nm (17 ftlb.)
Starter
- Install line for ATF cooling at the top with new O-rings.
- 4.1
Screw in and tighten screw -3-
.
- Tightening torque 20 Nm (15 ftlb.)
- 4.2
Screw in and tighten screw -2-
.
- Tightening torque 8 Nm (6 ftlb.)
ATF cooling line, top
- 4.1
Screw in and tighten screw -3-
.
- Screw in and tighten screws -2-
.
- Tightening torque 8 Nm (6 ftlb.)
ATF cooling line, bottom
- Tighten screws -2-
on engine support.
- Tightening torque 50 Nm (37 ftlb.)
Right engine support
- Tighten nut -2-
.
- Tightening torque 20 Nm (15 ftlb.)
Electric line from starter to engine support