LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Macan T >> Repair and Diagnosis >> External Pages >> Different car >> Section 25 (38 Automatic Transmission Gears Control 3.0L -- 95B - MACAN (95B)) >> WM, 386219 Removing And Installing Line For ATF Cooling (V6 Turbo) >> Installing Line For ATF Cooling >> Installing Atf Cooling Line (Front Section)

Installing Atf Cooling Line (Front Section)

WARNING: This page is about a different car, the 2021 Porsche Macan, 2020 Porsche Macan, and 2019 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install front section of ATF cooling line -1-  .
    G15152916Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    ATF cooling line - front section

    1. 1.1  Fit front section of ATF cooling line
    2. 1.2  Screw in and tighten screws on the ATF cooling line -2 and 3-  .

      > Tightening - torque 5 Nm (3.5 ftlb.) 

  2. Connect ATF cooling line connection point.
    G15152917Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Connection point for the ATF cooling line

    1. 2.1  Fit front sections -3-  on rear section.
    2. 2.2  Screw on and tighten union nuts -1-  and counter at the hexagon -2-  at the same time.

      > Tightening - torque 29 Nm (21 ftlb.)